top of page
TKNL was hired to design, install and program the multimedia equipment in Bombardier's highly technological conference centre.
From the onset, our involvement with Bombardier's team of architects and engineers helped us to seamlessly integrate our solution. The numerous rooms, spread out on two floors, were centralized to minimise the hardware count. This design allowed for smaller credenza, less local heat dissipation and less ambient noise in the boardrooms.






RELATED PROJECTS




LET'S TALK ABOUT YOUR PROJECT
TKNL HEADQUARTERS
450.449.1717
TKNL MONTREAL
514.524.8520
TKNL OTTAWA
613.745.0333
GET INSPIRED EVERY DAY
© 2019 TKNL
bottom of page